← All projects
Industrial Building · 2025
Dilovası Yeniler Factory
The project was successfully delivered following the manufacturing and assembly phases, which spanned one year.
- Location
- Kocaeli/Dilovası
- Sector
- Production

Challenge
Subsequent changes to the project design, drafting errors, and harsh weather conditions.
Solution
Fabrication operations on-site were completed using gas-shielded welding. A new professional team was assembled specifically for the installation phase of this project.